The project widened Cherry Valley Road and included installation of 950 linear feet of new sidewalk and bicycle lane on Cherry Valley Road and Main Street NE (SR-203). The project also included construction of a 340-foot long textured soil nail wall to protect and stabilize the adjacent steep slope along with storm water (runoff) improvements including a bio-retention area.